normally, the construction time of every unit / building is calculated by its costs. this is not the case for demolition.
currently, the demolition time does not decrease with higher ion technology. -> less costs, same time.
I suggest that the demolition costs are used to calculate the demolition time, instead of using the construction time of the previous building level.
currently, the demolition time does not decrease with higher ion technology. -> less costs, same time.
I suggest that the demolition costs are used to calculate the demolition time, instead of using the construction time of the previous building level.
The post was edited 1 time, last by Dark Sky ().