The suggestion is about be able to change submitted tasks in construction queue for shipyard.
That means... if you have 9999 LC + 9999 SC + 5 RIP's ongoing... be able to reorder the tasks getting (for instance) 5 RIP's + 9999 LC + 9999 SC, just drag them on the queue.
That means... if you have 9999 LC + 9999 SC + 5 RIP's ongoing... be able to reorder the tasks getting (for instance) 5 RIP's + 9999 LC + 9999 SC, just drag them on the queue.